Guides
INS / IND — instrumentation
For serious/classical repertoire: INS summarises the standard instrumentation of the work, IND details individual instruments.
The exact field layout — positions, sizes, and formats — is defined in CISAC's CWR specification (CWR19-1070R1), available to CISAC members and licensees. The validator implements the full layout: drop a file on it and every INS / IND line is parsed field by field, with problems tied to the exact characters at fault.
Two free checks for your CWR file. Is the file correct? Every record, share and control total against the spec, each problem on its exact line. Do its writers match their registrations? Every writer cross-checked against public registration data, including works registered under another spelling or IPI. Nothing stored: check a file at cwrcheck.com.